Metro Pacific Tollways South (MPT South) is targeting the December opening of the remaining sections of the Cavite-Laguna Expressway (CALAX) and the CAVITEX-CALAX Link (CCLink), which will further improve connectivity between Cavite, Laguna, and Metro Manila.
The three road components slated for opening are CALAX Subsections 1 and 2, and the 1.2-kilometer CCLink.
CALAX Subsection 1, spanning 7.22 kilometers from Centennial Road in Kawit to Open Canal Interchange in Imus City, is expected to reduce travel time from 25 minutes to just eight minutes. Another section is projected to cut travel time from 20 minutes to 11 minutes.
Meanwhile, CCLink will directly connect CAVITEX and CALAX, allowing motorists to travel between the two expressways without passing through several local roads.
MPT South presented the developments to CALABARZON media practitioners during a site tour on Saturday, November 21, as preparations continue for the targeted simultaneous opening of the three road components in December.
- MPT South backs barrier-less toll system, cites cash collection challenge - November 22, 2026
- MPT South targets December opening of remaining CALAX sections, CALAX, CAVITEX link - November 22, 2026
- Panduan Lengkap Menemukan dan Menggunakan Link Judi Bola Resmi Terpercaya - November 16, 2026